Development and delivery of a commercial-scale pyrolysis research facility, beginning with early-stage venture development and laboratory testing, then progressing through industrial installation, commissioning and operation.

Project
Commercial-Scale Pyrolysis R&D Facility
Project role
Raymond McGreal
Co-founder
Organisation
HEAT Systems / Carbon Clean
Prior professional experience
Location
Claremorris, County Mayo
Ireland
Commercial-scale indirectly fired rotary kiln in industrial facility, with burners and controls
Fig. 01 / Commercial-scale pyrolysis research facility, Claremorris, County Mayo, Ireland.
01The project

Building a platform
for thermal research.

The project began with an empty industrial warehouse in Claremorris. We established a laboratory, installed a small-scale pyrolysis system and began developing the practical knowledge needed to progress the technology.

Over a number of years, the laboratory supported research programmes and trials, including publicly funded research and paid testing for private clients. That work created a foundation for scaling up from a small research system to a commercial-scale continuous pyrolysis facility.

The resulting installation centred on an indirect-fired rotary kiln, with material handling, heating, controls and supporting infrastructure brought together within an operational research environment.

Core equipment
Rotary kilnContinuous, indirect-fired process
Approx. throughput
1.2 t/hourReported system capacity
Published temperature
Up to 900°CReported operating figure
Facilities
Plant + laboratoryResearch, client trials and scale-up development
02My role

Co-founder.
Hands-on delivery.

As a co-founder, my contribution combined business development with the practical work of creating and operating an industrial research facility.

My responsibilities moved between funding, research planning and stakeholder discussions, careful design and prototyping, contractor management, waste facility permit requirements, on-site installation and commissioning. I also operated the laboratory and its test systems.

01 / DEVELOPMENT

Venture development & funding

Contributed extensively to fundraising activities, funding applications and the administration and management of research funding programmes.

02 / LABORATORY

Research & paid trials

Operated the laboratory and lab-scale system, supported funded research and delivered testing activities for private clients.

03 / DESIGN

Design & prototyping

Developed, modelled and prototyped practical solutions, using testing and observation to inform technical decisions.

04 / DELIVERY

Installation & contractors

Led on-site installation activities, coordinated contractors and resolved practical equipment and facility integration challenges.

05 / COMPLIANCE

Permitting & stakeholders

Implemented waste facility permit requirements and engaged with project partners, contractors and other stakeholders.

06 / COMMISSIONING

Start-up & troubleshooting

Worked hands-on through equipment integration, installation and commissioning, resolving issues as the facility moved towards operation.

03The system

Industrial-scale
experimental facility

The industrial installation brought together an indirect-fired rotary kiln and the surrounding equipment needed for continuous processing, including feed handling, heat delivery, controls and plant support systems.

It was conceived as an experimental facility rather than a fixed-purpose production line. The laboratory and industrial plant could support material trials, process learning and further technical development.

View down the interior of rotary kiln drum showing internal flights
Fig. 03.1 / Rotary drum interior and internal lifters
Hand holding granular carbon material
Fig. 03.2 / Process material sample
04Project delivery

From a laboratory
to industrial scale.

The facility was developed in stages. We established small-scale research capability first, spent years running trials and learning from the results, then undertook the larger investment and coordination required for an industrial-scale installation.

At every stage, progress depended on practical decisions across design, funding, contractors, permitting and commissioning, with testing informing what happened next.

01 / SET-UP

Establish the lab

Adapt an empty warehouse and install the small-scale system and laboratory infrastructure.

02 / RESEARCH

Run trials & learn

Operate the lab for funded research and paid client trials, refining process knowledge over time.

03 / SCALE-UP

Develop the plant

Progress research and funding plans, coordinate equipment and prepare for industrial installation.

04 / DELIVERY

Install & commission

Manage contractors, implement permit requirements, resolve site issues and commission the facility.

05Experience and approach

Thinking, designing
and making.

This project gave me long-term experience working across research, physical construction, industrial operations, funding, regulation and collaboration. It also reinforced the value of learning through direct experimentation.

That experience now informs my independent practice at FutureBright, from pyrolysis and research demonstrators to technical visualisation, prototypes and original physical objects.

My approach is iterative. Ideas develop through a conversation between theory and practice: careful observation, drawing and modelling, hands-on prototyping, testing and redesign. Each stage informs the next, leaving room for both technical rigour and creative discovery.

This case study documents prior professional experience with HEAT Systems / Carbon Clean. The facility was not commissioned through FutureBright.

FUTUREBRIGHT / CONTINUING THE WORK

Have a project to develop?

FutureBright brings practical experience in research, design and making to pyrolysis systems, prototypes, visualisation and original physical projects. Get in touch to discuss an idea or a development challenge.

[ MENU ]

EMAIL

SOCIAL

Instagram, TikTok, LinkedIn

/// SYSTEM STATUS: ONLINE